Contacts
Apartments:
+421 907 828 581
mihalovicova@iuris.sk
Commercial premises:
+421 918 708 662
biro@iuris.sk
Equipment of standard apartments
Structural system
• System of reinforced concrete poles, stairs, monolithic ceilings
• Brick construction of external and dividing walls
• Thermally insulated exterior panelling
Windows
• Plastic windows with external colour foil made of plastics
• Windowsill internal: white plastics
• Windowsill external: white aluminium
Door
• Interior door: standardised, overlay doorframe, ironwork
• Entry door: standardised, anti-fire doors, security doors, metal doorframe, ironwork
Ceramic tails
• Interior tiles (bathroom, toilet): ceramic tiling up to doorframe, selection from submitted pattern book
Flooring
• kitchen floor: floating floor - laminate
• floor in rooms: floating floor - laminate
• bathroom and toilet floor: ceramic tiles
• loggia and balcony floor: ceramic tiles
• terrace floor: scrubbed concrete combined with gravel spreading
Sanitary fittings and utility networks
• water supply: combined (steel + plastic)
• kitchen: preparation of utilities in accordance with lay-out plan
• batch classic - producer Kaldewei or comparable product from other manufacturer
• batch - wall faucet
• wash basin Jika Laufen
• wash basin faucet
• bracket toilet - hanging with seat, concealed flush system, producer Jika Laufen
Electrical installation
• electrical installations: as per lay-out plant, utility networks are dimensioned for ceramic cooking range and air-conditioning
• meters: separate measuring of electricity consumption with each apartment
(common area and lift will have separate measuring installed)
• plugs and power switches: Legrand type or comparable product from other manufacturer
• data networks: light-current networks – integrated networks for cable TV, internet, telephone, and videophone
• videophone: 1 device in each apartment with remote control of electronic entry door system
Heating
• Central heating: gas boiler-room situated on the 2nd floor
• Central heating - networks: combined (steel and plastic)
• Heating units: “KORAD” radiator
• Meters: separately measured power consumption of each apartment
Air-conditioning
• All apartments will have pre-arranged plan of networks and niche for air-conditioning device situated in loggia
Room decorating
• Walls and ceilings of rooms – 2 layers of whitewash white